FOB Price
Get Latest Price( Negotiable )
|50000 Metric Ton Minimum Order
Country:
Russia
Model No:
-
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
50000 Metric Ton
Packaging Detail:
LNG Tanker
Delivery Time:
21 DAYS
Supplying Ability:
-
Payment Type:
T/T, L/C
Product Group :
-
Russia
Contact Person vladimir
A typical LNG process. The gas is first extracted and transported
to a processing plant where it is purified by removing any
condensates such as water, oil, mud, as well as other gases such as
CO2 and H2S. An LNG process train will also typically be designed
to remove trace amounts of mercury from the gas stream to prevent
mercury amalgamizing with aluminium in the cryogenic heat
exchangers. The gas is then cooled down in stages until it is
liquefied. LNG is finally stored in storage tanks and can be loaded
and shipped.
LNG is principally used for transporting natural gas to markets, where it is regasified and distributed as pipeline natural gas. It can be used in natural gas vehicles, although it is more common to design vehicles to use compressed natural gas. Its relatively high cost of production and the need to store it in expensive cryogenic tanks have hindered widespread commercial use. Despite these drawbacks, on energy basis LNG production is expected to hit *0% of the global crude production by ***0.
Country: | Russia |
Model No: | - |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 50000 Metric Ton |
Packaging Detail: | LNG Tanker |
Delivery Time: | 21 DAYS |
Supplying Ability: | - |
Payment Type: | T/T, L/C |
Product Group : | - |